Junctionroadsign meaning

#104 - 2945 190th Street, Surrey, BC V3Z 0W5Phone: 604-525-6700 Fax: 604-525-4224Toll Free: 1-800-665-5444email: sales@greenlinehose.com

It may take 6 to 8 weeks or more for works to be carried out, and the ability to carry out works is dependent on suitable weather.

Jct roadmeaning

A Highway Inspector will attend the site within a maximum of 4 working days and make appropriate recommendations, which may or may not include a request to refresh the road markings. We cannot guarantee that every request will lead to action being taken.

JCTmeaning in construction

Image

Image

If it's determined that action is required, then works will be carried out as soon as we are able to attend based on current capacity and the urgency of the case.